back to list

Send an inquiry

Located in the very heart of Burgas city centre, this new project combines all the modern tendencies of the residential buildings – contemporary architecture, original design and luxury finishing of the common parts e t c.

This building is situated on Samuil Str, only meters away from the main walking street of the town and very close to the University of Burgas, different state and municipal institutions, popular shops and restaurants- everything that could insure a great rental potential.

The materials chosen for the construction are of highest quality, following the latest editions of thermo and hydro insulation.
The building area is rationally distributed insuring the comfort of the residents.

There are few offices located on the lower floors, studios and one-bedroom apartments.

All the units will be handed over in the following stage of completion, using materials of highest quality:

  • Type of construction: monolithic, with reinforced concrete frame structure, with surrounding and internal brick walls;
  • Floors:
    • Entrance halls, corridors and rooms: cement floor coat;
    • Wet rooms: cement floor coat;
    • Balconies: granite tiles;
    • Common parts of the building: granite tiles, plastered and painted walls.
  • Walls: brick walls
  • Surrounding external walls  - with thermo insulation, painted in colour according to the project;
  • Internal walls – plastered, with lime putty.
  • Ceilings: concrete slab, plastered, with lime putty.
  • Framework:
    • Entrance doors – German steel doors Hoermann, internal MDF doors or steel doors Hoermann;
  • Windows: – four-chamber PVC window profile Profilink.
  • Water and sewerage installations:water and sewerage piping, till end –caps, connected to the mains water and sewerage systems.
  • Electrical installation: fully completed wiring, with exits for plugs and switches.
  • Bells and video – intercom installation:installed, fully equipped, to be used according to the project.
  • Elevators:completed construction of the shaft, installed elevator after the mandatory tests, according to the project.
  • Telephone and TV installations
  • Ventilation system and chimneys: according to the project
  • Gas installation
  • Underground level: basement premises according to the project.